A Kuala Lumpur batik workshop planned for 16 January has been postponed. If the replacement date is unknown, put a postponement notice where visitors would normally see the schedule. Keep the original dates in JSON-LD with a postponed status. Once the organiser sets a new date, update the page and markup together.
Use the status that matches the confirmed schedule
| Workshop state | What visitors see | What changes in Event markup |
|---|---|---|
| New date unknown | “Postponed. New date to be confirmed.” | Set EventPostponed. Keep the original dates and location. |
| New date confirmed for 30 January | The new date, local time and venue. | Set EventRescheduled. Replace the start and end dates. Optionally retain the old start in previousStartDate. |
Update the dates when the new slot is confirmed
Here are the changed fields for the fictional 2027 workshop at 10 a.m. to noon in Kuala Lumpur. Merge these fields into the existing Event object, which also describes the event name and venue.
{
"eventStatus": "https://schema.org/EventRescheduled",
"startDate": "2027-01-30T10:00:00+08:00",
"endDate": "2027-01-30T12:00:00+08:00",
"previousStartDate": "2027-01-16T10:00:00+08:00"
}
We parsed local versions of the postponed and rescheduled page. The postponed fixture kept the original schedule in JSON-LD and showed a notice to visitors. The rescheduled fixture showed the new date. In a separate failing check, the markup was updated but the visible label still read 16 January. The local check caught the mismatch.
Check the notice, booking and markup together
- Keep the dedicated page for the same workshop. Update its notice and tell ticket holders which date is current. Review any booking page that still shows the old slot.
- Inspect the rendered JSON-LD using the structured data testing guide. Check the venue, time zone offset and current dates. Ensure an old template or plugin has not printed a second Event object with the previous schedule.
- After publishing, confirm the public page and use URL Inspection on the event URL if you have access. Google’s processing and presentation are separate from your markup check.
Frequently asked questions
Should I remove the original start date while waiting?
Keep the original date in the Event markup while its status is postponed. Tell visitors on the page that the old date will no longer go ahead.
Is previousStartDate required when an event moves?
It is optional. If you include it, Google requires EventRescheduled. The current start date must be the confirmed new one.
Does valid markup make the event appear in Google’s event feature in Malaysia?
Google’s published list for the enhanced event search experience does not currently include Malaysia. Use the example to keep a Malaysian event page and its markup consistent.

